Our corporation started as a company. Its purpose
was to develop the urban planning of the area corresponding to
the old port of Buenos Aires city, Puerto Madero, which had an
extension of 170 hectares. The process started when the National
Government and Buenos Aires city transferred the lands to the
Corporation for its development.
Challenges of this urban planning and
development:
- To recover an area connected with the administrative,
financial and trade centre of the city.
- To revert the dissociating tendency of the
city towards its riverside.
- To develop an urban planning, which could
boost the southern area of the city.
- To promote a balanced development between
green and private areas.
The project was a success because the most important
real estate agencies and leading international companies were
interested in locating their headquarters and offices in this
area.
Stages:
- 1.- Planning
- 2.- West Side Development
- 3.- East Side Development
1.- Planning
“Corporación Antiguo Puerto Madero
S.A.” was in charge of the planning. There was an official
announcement made together with the Architects Association, summoning
the main urban referents. After that, there was a lands division,
a tendering procedure and sales. Our Corporation was responsible
for the works of the open and green areas and the services´
infrastructure.
2. West Side
 |
|
Unrecycled Dock
|
| |
 |
|
Recycled Dock
|
The recycling works started, once the plan was
established and accepted. The starting point was to recycle the
west side of the brick docks. These buildings had been built next
to the port and had been former goods warehouses. Therefore,
the architectonic and historical value was the most important
issue to be considered, as it represented the port´s identity
in that area.
Following the official announcement there was
a tendering procedure. Many private investors showed enthusiasm
towards the proposal. There were26 groups of investors that submitted
the first tender for the first five buildings, with a surface
of 320,000 square metres.
After a few years, the recycling was successfully accomplished,
and Puerto Madero area turned out to be a coveted area, where
many companies, stores and well-known restaurants established
themselves.
The Corporation was in charge of setting up a public utility network
, avenues and road building.
3.- The East Side
 |
|
Private home Building
|
| |
 |
|
|
As the West Side turned out to be a success,
it encouraged the launching of the East Side, where the plots
of building land were bigger. Different from the West Side, which
had a historical background; this area constituted the modern
area, where buildings with the latest technology could be built.
Similar procedures to the first stage were followed. The surface
of the area was of 1,600,000 square metres and the lands for sale
were put out to tender.
The corporation was again in charge of setting up the infrastructure
works of the area. The surface covering this area, was three times
bigger than the size of the previous area. It also included bigger
parks, promenades and big open and green areas.